PMP备考每日试题(240924)
每期慧翔天地小编都会附上5~10道PMP®综合测试题,以帮助大家达到练习的效果,本期PMP试题答案会附加在下一期的结尾。大家如果想了解2024年PMP®考试报考流程、PMP®报考时间、PMP®报考条件、PMP®报考费用、PMP®报考资格测评等等均可访问站内进行了解。
PMP备考刷题交流群:667625965(点击一键加群)
1、项目经理要求持续监测某一条流水线的产品质量,以评价过程改进是否达到了预期的改进效果,应使用以下哪种工具与技术?()
A、控制图
B、因果图
C、统计抽样
D、直方图
2、项目经理正在与两个都声称对某一特定可交付成果拥有所有权的职能经理交涉。项目经理可以查阅哪—份文件能说明该问题的文件
A、工作分解结构
B、需求追踪矩阵
C、项目工作说明书
D、责任分配矩阵
3、During a project's execution phase,a defect is identified that affects two functional teams in a weak matrix organization.N either team wants to take responsibility for fixing the defect because they are busy with other tasks.What should the project manager do?
在项目执行阶段,发现了一个缺陷,影响到一个弱矩阵组织中的两个职能团队。两个团队都不想承担修复缺陷的责任,因为他们忙于完成其他任务。项目经理应该做什么?
A、Discuss the matter with both functional managers to obtain agreement on fixing the defect.与两位职能经理讨论此事,就修复缺陷达成一致意见。
B、Meet with both functional teams to obtain agreement on the responsibility for fixing the defect.与两个职能团队开会.就修复缺陷的责任达成一致意见。
C、Assign the task to the team for which fixing the defect is more pertinent.将任务分配给修复缺陷更相关的团队。
D、Ask the sponsor to clarify the responsibility for the fix with the two functional managers.要求发起人澄清两位职能经理的修复责任。
4、一个敏捷团队正在为客户开发定制制造设备。经过三次迭代,一个功能原型已经就绪,但是它缺乏关键的安全功能,以及一些可以在未来版本中现场安装的增强功能。为了尽早得到客户的反馈,产品负责人要求团队尽快交付MVP。项目经理应如何处理产品负责人的要求?
A:在原型上安装安全功能和增强功能,并交付给客户端
B:仅安装原型上的安全功能,然后交付给客户端
C:将原型以当前状态交付给客户端,因为它已经正常运行
D:仅安装原型上的增强功能并交付给客户端
An agile team is developing custom manufacturing equipment for a client.After three iterations,a functional prototype is ready,but it lacks critical safety features as well as several enhancements that can be installed on-site in future releases.To get early feedback from the client,the product owner requests that the team deliver an MVP as soon as possible.What should the project manager do to address the product owner's request?
A.Install safety features and enhancements on the prototype and deliver it to the client
B.Install only the safety features on the prototype and deliver it to the client
C.Deliver the prototype to the client in its current condition as it is already functiona
D.Install only the enhancements on the prototype and deliver it to the client
5、一名敏捷团队成员正在尝试了解团队目前进行的迭代状态。哪一项信息发射源
将提供帮助?
A.迭代待办列表
B.Sprint计划
C.迭代燃尽
D.发布计划
(240923)答案
6、B
7、D
8、C
9、A
10、D